AbouRizk, S M and Wales, R J (1997) Combined Discrete-Event/Continuous Simulation for Project Planning. Journal of Construction Engineering and Management, 123(01), 11–20.

Crowley, L G (1997) Robust Statistical Estimators for Use within Competitive Bid Data. Journal of Construction Engineering and Management, 123(01), 53–63.

Daoud, O E K (1997) The Architect/Engineer's Role in Rehabilitation Work. Journal of Construction Engineering and Management, 123(01), 1–5.

Elazouni, A M (1997) Constructability Improvement of Steel Silos during Field Operations. Journal of Construction Engineering and Management, 123(01), 21–25.

Everett, J G and Farghal, S H (1997) Data Representation for Predicting Performance with Learning Curves. Journal of Construction Engineering and Management, 123(01), 46–52.

Farghal, S H and Everett, J G (1997) Learning Curves: Accuracy in Predicting Future Performance. Journal of Construction Engineering and Management, 123(01), 41–45.

Kangari, R and Miyatake, Y (1997) Developing and Managing Innovative Construction Technologies in Japan. Journal of Construction Engineering and Management, 123(01), 72–78.

Kartam, S, Ballard, G and Ibbs, C W (1997) Introducing a New Concept and Approach to Modeling Construction. Journal of Construction Engineering and Management, 123(01), 89–97.

Mondorf, P E, Kuprenas, J A and Kordahi, E N (1997) Segmental Cantilever Bridge Construction Case Study. Journal of Construction Engineering and Management, 123(01), 79–84.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(79)
  • Abstract:
    The cast-in-place segmental cantilever construction method, further to its well-known advantages for long span bridge construction in general, does provide appropriate means to satisfy local needs for relatively long spans in an urban environment, practically without infringing on traffic or property below. Detailed are the structural considerations and construction challenges in the use of segmental cantilever bridges in two such urban environment cases for the Los Angeles County Metropolitan Transit Authority Metro Rail System. The Kramer Bridge is a continuous four-span box girder bridge 189 m (620 ft) long spanning over what previously was a hazardous-waste site. The Rosecrans Bridge is a continuous three-span box girder bridge 204 m (670 ft) long spanning diagonally over a busy city intersection. Despite difficulties experienced in the piling, cantilever, alignment, and closure operations, the cast-in-place segmental cantilever construction method allowed fast and economically competitive construction of two aesthetically pleasing structures.

Russell, J S, Jaselskis, E J and Lawrence, S P (1997) Continuous Assessment of Project Performance. Journal of Construction Engineering and Management, 123(01), 64–71.

Shi, J and AbouRizk, S M (1997) Resource-Based Modeling for Construction Simulation. Journal of Construction Engineering and Management, 123(01), 26–33.

Songer, A D and Molenaar, K R (1997) Project Characteristics for Successful Public-Sector Design-Build. Journal of Construction Engineering and Management, 123(01), 34–40.

Tiong, R L K and Alum, J (1997) Final Negotiation in Competitive BOT Tender. Journal of Construction Engineering and Management, 123(01), 6–10.

Touran, A, Sheahan, T C and Ozcan, E (1997) Rational Equipment Selection Method Based on Soil Conditions. Journal of Construction Engineering and Management, 123(01), 85–88.